FOR TS CONDUCTOR

Named projects inside a current planning or funding trigger

Ranked by policy, regulatory or planning trigger, commercial exposure, TS technical fit, timing and influenceability, economic and structure pressure, buyer accessibility, and evidence quality.

Showing 15 of 15 targets.

97
Data center load growth drove a rescope to advanced conductors at 3,000 A or more
High ampacity reconductoring in existing structures
Present a 3,000 A conductor optimization package comparing size, weight, sag temperature behavior, structure loading, hardware changes, outage sequence, installation implications, and total installed cost.
View details
SPECIFICATION WINDOWSDG&E TL623C San Ysidro to Otay Tap 69 kV

California | SDG&E

95
CAISO approved the need but left the conductor versus rebuild choice open
Advanced conductor avoiding wood pole replacement
Offer a pole by pole PLS CADD and structural feasibility comparison between TS and the standard conductor rebuild alternative.
View details
ACTIVE / QUALIFYAEP Texas DOE financed transmission portfolio

Texas | AEP Texas

91
DOE closed up to $3.26B for roughly 100 projects across about 2,800 miles
Portfolio conductor standards qualification
Seek a portfolio level technical review and rank projects by existing structure loading, required ampacity increase, line length, rebuild cost, schedule, and conductor lock risk.
View details
ACTIVE / QUALIFYPG&E South Bay Reinforcement

California | PG&E

88
Advanced reconductoring within the approved South Bay reinforcement program
Capacity increase within existing corridors
Fold into a PG&E standards qualification path, and track Segment G coordination before proposing segment level scope or schedule.
View details
ACTIVE / QUALIFYPG&E Lincoln to Pleasant Grove 115 kV

California | PG&E

87
Approved reconductoring need in CAISO 2025 to 2026 planning, at least 1,517 A summer emergency
115 kV reconductoring within existing structures
Position within the PG&E standards qualification path and offer loading and installed cost analysis against the stated 1,517 A requirement.
View details
PREPARE / QUALIFYSCE Pardee to Santa Clara 230 kV

California | SCE

84
SB1006 screening surfaced a roughly 40 mile HTLS reconductoring concept
Installed cost competition against HTLS
Prepare a line specific installed cost and structure modification comparison and hold it ready for the next scope discussion.
View details
PREPARE / QUALIFYSCE Santa Clara to Vincent 230 kV

California | SCE

83
Second roughly 40 mile HTLS concept from SCE's SB1006 screening
Installed cost competition against HTLS
Extend the same installed cost and structure modification comparison to this line so both concepts can be addressed together.
View details
POLICY ENGAGEMENTDominion Energy Virginia SB249 and IRP pathway

Virginia | Dominion Energy Virginia

82
SB249 wrote advanced conductors into the utility planning framework
Evaluation metric definition
Provide technical evaluation metric material to the SCC implementation process and to utility planning stakeholders.
View details
ACTIVE / QUALIFYPG&E South Oakland Reinforcement

California | PG&E

81
Advanced reconductoring identified in CAISO planning for South Oakland
Urban capacity increase without new structures
Include in the PG&E standards qualification case using urban ROW and permitting constraints as the economic argument, and qualify engineering stage before committing project level effort.
View details
QUALIFY FASTPG&E Herndon to Bullard Nos. 1 & 2 115 kV

California | PG&E

79
In engineering per PG&E 2026 reporting, construction expected in 2027
Double circuit 115 kV reconductoring
Qualify stage and conductor status quickly, then either engage on loading analysis or close it out.
View details
POLICY ENGAGEMENTXcel / Public Service Company of Colorado HB26 1081 pathway

Colorado | Xcel Energy / Public Service Company of Colorado

78
HB26 1081 requires ATT consideration in Colorado 10 year plans
Measurable ATT comparison requirements
Prepare Colorado PUC rulemaking comments and technical material for utility planning engagement before rules are proposed.
View details
ON HOLD / RE SCOPE WATCHSCE Julian Hinds to Mirage 230 kV

California | SCE

77
Procedural status overrides the numeric score. Not an active procurement.
Real 47 mile HTLS project, placed on hold by CAISO after cost escalation
Long span HTLS reconductoring
Monitor for release of the hold or a rescope, and hold a cost reduction analysis ready rather than pursuing actively.
View details
CAISO approved the reconductoring project in the 2025 to 2026 plan, about $64M estimated
Sub transmission capacity increase
Qualify required ampacity and structure condition before committing engineering effort.
View details
MONITOR / QUALIFYAEP Texas Uvalde to West Batesville 138 kV rebuild

Texas | AEP Texas

68
DOE posted the environmental review item Sep. 1, 2026
138 kV rebuild conductor optimization
Use as a qualification test case for portfolio segmentation rather than an individual pursuit.
View details
MONITOR / QUALIFYAEP Texas Hamlin to Roby 69 kV

Texas | AEP Texas

64
DOE posted the environmental review item Sep. 4, 2026
Low voltage portfolio segmentation test
Hold at monitor. Do not allocate engineering effort without evidence of an open conductor decision.
View details
  • 85 to 100: Active pursuit
  • 70 to 84: Pursue / qualify
  • 55 to 69: Prepare / monitor
  • Below 55: Exclude

A procedural fact can override a numeric score. A technically attractive project that is explicitly on hold is not an active procurement.

  • Policy, regulatory or planning trigger20
  • Commercial exposure20
  • TS technical fit20
  • Timing and influenceability15
  • Economic, ROW or structure pressure10
  • Buyer accessibility5
  • Evidence quality10