FOR TS CONDUCTOR

All target accounts

SDG&E TL623C San Ysidro to Otay Tap 69 kV

A planning authority has documented the conductor question as unresolved and named the structural analysis that will settle it.

ACTIVE PURSUITScore: 95 of 100Confidence: High

Evidence chain

  1. 1
    CAISO approved reconductoring to raise the TL623C normal rating to 136 MVA at an estimated $5.4M, with a 2032 in service target, and stated that aged wood pole infrastructure requires detailed structural analysis.
  2. 2
    The lower cost case assumes advanced conductor can be used without structure replacement on feasible sections, while the upper case assumes a full rebuild with standard conductor. SDG&E must provide analysis in the next planning cycle and seek CAISO approval for final scope.
  3. 3
    Low weight, high capacity conductor that raises the rating on existing wood pole sections, supported by structural loading analysis and installation sequencing.
  4. 4
    Yes. The decision is documented as open and the deciding analysis has not yet been filed.
  5. 5
    Offer a pole by pole PLS CADD and structural feasibility comparison between TS and the standard conductor rebuild alternative.
  6. 6
    SDG&E structural engineering and transmission planning, with CAISO approving final scope.
  7. 7
    How much of the route is overhead and feasible for reconductoring without structure replacement is not established at segment level.
  8. 8

Score breakdown

Policy, regulatory or planning trigger20 / 20
Commercial exposure19 / 20
TS technical fit20 / 20
Timing and influenceability15 / 15
Economic, ROW or structure pressure9 / 10
Buyer accessibility4 / 5
Evidence quality8 / 10
95 / 100
SDG&E | California
SPECIFICATION WINDOW
Need approved, scope unresolved
Explicitly open in CAISO documentation
Advanced conductor avoiding wood pole replacement
The structural analysis is due in the next planning cycle.

Required caution

Part of the project is underground, where the overhead conductor proposition does not apply.

Evidence labels

Confirmed factPolicySight assessment

A high score supports commercial diligence. It does not indicate an open procurement or an established supplier decision.