PG&E Lincoln to Pleasant Grove 115 kV

An approved reconductoring need with a stated ampacity requirement and a long in service date, which is exactly the profile where a specification can still be shaped.

ACTIVE PURSUITScore: 87 of 100Confidence: Medium

Evidence chain

  1. 1
    CAISO 2025 to 2026 planning includes an approved reconductoring need on Lincoln to Pleasant Grove 115 kV with a required rating of at least 1,517 A summer emergency, an estimated cost of $60M to $120M, and a 2034 in service target.
  2. 2
    The required rating is stated and the cost range is wide, which usually means structure treatment and rebuild extent are still being resolved. The public conductor type is not specified.
  3. 3
    High ampacity conductor meeting at least a 1,517 A summer emergency requirement with limited structural modification, supported by loading analysis that narrows the cost range.
  4. 4
    Yes on the specification question. No public conductor type is established and the in service target is 2034, so design decisions are ahead rather than behind.
  5. 5
    Position within the PG&E standards qualification path and offer loading and installed cost analysis against the stated 1,517 A requirement.
  6. 6
    PG&E transmission engineering, standards, and project engineering.
  7. 7
    Detailed structure condition, rebuild extent, and where inside the $60M to $120M range the project settles are not public.
  8. 8

Score breakdown

Policy, regulatory or planning trigger18 / 20
Commercial exposure18 / 20
TS technical fit18 / 20
Timing and influenceability12 / 15
Economic, ROW or structure pressure9 / 10
Buyer accessibility4 / 5
Evidence quality8 / 10
87 / 100
PG&E | California
ACTIVE / QUALIFY
Approved in CAISO planning
Public conductor type not specified
115 kV reconductoring within existing structures
A strong standards and specification prospect precisely because the 2034 in service date leaves the conductor decision open. Qualification work done now applies when design begins.

Evidence labels

Confirmed factPolicySight assessmentUnverified

A high score supports commercial diligence. It does not indicate an open procurement or an established supplier decision.