PG&E Herndon to Bullard Nos. 1 & 2 115 kV

A two circuit 115 kV project already in engineering with construction expected in 2027, so the specification window is short.

QUALIFY FASTScore: 79 of 100Confidence: Medium

Evidence chain

  1. 1
    PG&E's 2026 reporting places Herndon to Bullard Nos. 1 & 2 115 kV in engineering, with construction expected in 2027. The public conductor specification is not established.
  2. 2
    Two circuits on shared structures concentrate loading questions, which makes conductor weight and sag behavior decisive for structure retention.
  3. 3
    Lighter high capacity conductor supporting double circuit retention without full structure replacement.
  4. 4
    Uncertain and time limited. Engineering is active, so qualify quickly to establish whether the conductor decision is still open.
  5. 5
    Qualify stage and conductor status quickly, then either engage on loading analysis or close it out.
  6. 6
    PG&E project engineering and transmission standards.
  7. 7
    Whether conductor selection has already occurred inside active engineering is not public.
  8. 8

Score breakdown

Policy, regulatory or planning trigger16 / 20
Commercial exposure16 / 20
TS technical fit17 / 20
Timing and influenceability10 / 15
Economic, ROW or structure pressure8 / 10
Buyer accessibility4 / 5
Evidence quality8 / 10
79 / 100
PG&E | California
QUALIFY FAST
In engineering, 2027 construction expected
Public conductor specification not established
Double circuit 115 kV reconductoring
Specification may close quickly because engineering is active and construction is expected in 2027.

Evidence labels

Confirmed factPolicySight assessmentUnverified

A high score supports commercial diligence. It does not indicate an open procurement or an established supplier decision.