Target 10 of 15 | PG&E | California
PG&E Herndon to Bullard Nos. 1 & 2 115 kV
A two circuit 115 kV project already in engineering with construction expected in 2027, so the specification window is short.
QUALIFY FASTScore: 79 of 100Confidence: Medium
Evidence chain
- 1
Policy, planning or funding trigger
PG&E's 2026 reporting places Herndon to Bullard Nos. 1 & 2 115 kV in engineering, with construction expected in 2027. The public conductor specification is not established. - 2
Why this project is exposed
Two circuits on shared structures concentrate loading questions, which makes conductor weight and sag behavior decisive for structure retention. - 3
Relevant TS capability
Lighter high capacity conductor supporting double circuit retention without full structure replacement. - 4
Is specification still influenceable?
Uncertain and time limited. Engineering is active, so qualify quickly to establish whether the conductor decision is still open. - 5
Recommended commercial action
Qualify stage and conductor status quickly, then either engage on loading analysis or close it out. - 6
Likely buyer
PG&E project engineering and transmission standards. - 7
Key uncertainty
Whether conductor selection has already occurred inside active engineering is not public. - 8
Primary evidence
- PG&E Q1 2026 GO 131 E Project ReportUtility filing
- CPUC GO 131 E reporting programRegulatory authority guidance
Score breakdown
Policy, regulatory or planning trigger16 / 20
Commercial exposure16 / 20
TS technical fit17 / 20
Timing and influenceability10 / 15
Economic, ROW or structure pressure8 / 10
Buyer accessibility4 / 5
Evidence quality8 / 10
Total score79 / 100
Utility and jurisdiction
PG&E | California
Opportunity posture
QUALIFY FAST
Project stage
In engineering, 2027 construction expected
Specification status
Public conductor specification not established
Best fit TS capability
Double circuit 115 kV reconductoring
Why now
Specification may close quickly because engineering is active and construction is expected in 2027.